SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Ma H, Zhang W, Dong M. China Saf. Sci. J. 2020; 30(2): 28-34.

Copyright

(Copyright © 2020, China Occupational Safety and Health Association, Publisher Gai Xue bao)

DOI

10.16265/j.cnki.issn1003-3033.2020.02.005

PMID

unavailable

Abstract

In order to solve space conflicts in prefabricated building hoisting construction, with the conflict as research object, five kinds of object space and three kinds of space for single object were presented, three space conflict types were summarized, and consequently, quantitative evaluation indexes for spatial conflict severity were proposed. Secondly, a 3D spatial occupancy model and spatio-temporal occupancy model for different objects were developed according to construction characteristics of prefabricated buildings. Then, space conflict detection algorithm was put forward, and an multi-objective optimization model was built that minimized hoisting period, rental cost of cranes, construction cost and space conflict, which was applied into an actual prefabricated building project. The results show that this model and algorithm can effectively reduce conflict of working space and rental cost of cranes, thus optimizing hoisting schedule and improving safety performance. © 2020 China Safety Science Journal. All rights reserved.


Language: zh

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print