SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Zhou N, Jiang S. China Saf. Sci. J. 2020; 30: 152-157.

Copyright

(Copyright © 2020, China Occupational Safety and Health Association, Publisher Gai Xue bao)

DOI

10.16265/j.cnki.issn003-3033.2020.S1.027

PMID

unavailable

Abstract

In order to ensure the phase I project of Abuja Mass Railway Transit in Nigeria can get into formal operation smoothly, firstly, legal requirements of technical conditions for formal operation of urban rail transit in China were analyzed and the necessity of safety assessment of operation technical conditions before formal operation was expounded, then, based on the characteristics of the project, the work contents of prerequisite confirmation, system function verification, system linkage test and operation preparation were analyzed respectively to determine the key items of safety assessment, finally, organizational patterns and interface issues were analysed and implemented. The results show that it is necessary to introduce domestic safety evaluation mechanism before the new line of overseas urban rail transit project is officially put into operation, the adaptability analysis and adjustment should be made to the content and implementation mode of the safety assessment mechanism according to the equipment configuration characteristics of the project system and the operation environment of the location. © 2019 China Safety Science Journal


Language: zh

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print