SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Fan Q, Lin P, Wei P, Wang Z, Liu X, Yang J. China Saf. Sci. J. 2019; 29(1): 144-149.

Copyright

(Copyright © 2019, China Occupational Safety and Health Association, Publisher Gai Xue bao)

DOI

10.16265/j.cnki.issn1003-3033.2019.01.024

PMID

unavailable

Abstract

To prevent the safety accidents during the construction period of hydropower project, the accident occurrence mechanism and management strategies were studied. The characteristics of hidden dangers and safety accidents in hydropower projects in China were analyzed by means of data statistics, and the internal relations between the hidden danger and safety accident were illustrated, as well as the evolvement process and mechanism from the hidden danger to the safety accident. Based on the reality of the site safety control of hydropower projects in China, a new comprehensive risk control system and related specific measures were proposed for hydropower projects. The study results show that by using the flattening management method of hidden danger to control safety accidents when they make a start, the accident rate on the hydropower construction site can be reduced considerably, and the formation of the safety culture in the enterprise can be promoted effectively. © 2019 China Safety Science Journal. All rights reserved.


Language: zh

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print