SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Yang X, Liu X. China Saf. Sci. J. 2020; 30: 146-151.

Copyright

(Copyright © 2020, China Occupational Safety and Health Association, Publisher Gai Xue bao)

DOI

10.16265/j.cnki.issn003-3033.2020.S1.026

PMID

unavailable

Abstract

In order to ensure safety of high-speed railway transportation and improve work efficiency of completion acceptance, reduce test cost, save test time and put into operation as soon as possible, based on big data of dynamic detection of 101 high-speed railway projects in the actual acceptance work, dynamic inspection projects was analysed, studied and optimized. Firstly, experience and lessons in acceptance of high-speed railway from technical level was summarized. Secondly, existing problems were explored and analysed. Finally, improvement measures of high-speed railway completion acceptance system and technical standards was put forward. The results show that when revising supporting specifications for completion and acceptance of high-speed railway, testing items should be simplified based on big data of dynamic testing. Problems found in static acceptance inspection should be attached great importance, rectification before preliminary acceptance inspection can improve efficiency of completion acceptance inspection and provide more guarantees for operation safety of high-speed railway. © 2019 China Safety Science Journal


Language: zh

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print