SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Rupasinghe B, Wallace M, Gange G, Senthooran I. Sci. Rep. 2023; 13(1): e15386.

Copyright

(Copyright © 2023, Nature Publishing Group)

DOI

10.1038/s41598-023-40945-5

PMID

37717017

Abstract

Road pavement maintenance and upgrades (RPU) need to be scheduled in a way that minimises congestion across the road network and matches the schedule with the availability of equipment and skilled labourers to ensure that they are completed on time. RPU should not introduce unbearable congestion around blocked lanes or roads, and increased traffic due to ongoing road upgrades needs to be transferred to alternative routes. In situations where multiple upgrades are planned together, the scheduled road closures should be coordinated to not block alternative routes. While extensive studies have been conducted separately on scheduling and routing, limited research has linked these processes together, and only in restricted scenarios. In this paper, we investigate how to minimise the disruption of a set of road maintenance tasks based on their interaction with other tasks. We propose a new approach for scheduling a set of road maintenance tasks, some at the same time and others at different times, to minimise overall disruption. The proposed approach has two phases: (1) identify the local area affected by the RPU, and (2) determine which upgrades can be planned together to minimise congestion. The comparison of the results shows how the novel optimized approach identifies a better schedule to minimise congestion.


Language: en

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print