SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Jiang SH, Zhi HL, Wang ZZ, Zhang S. Nat. Hazards Rev. 2023; 24(1): e04022046.

Copyright

(Copyright © 2023, American Society of Civil Engineers)

DOI

10.1061/NHREFO.NHENG-1687

PMID

unavailable

Abstract

Evaluation of dike-break-induced flood risk has been a worldwide concern due to its enormous economic, environmental, and societal importance. The mitigation of flood risk in detention basins is a complex decision making process that could span multiple engineering and scientific disciplines. In this paper, an integrated dike-break-induced flood modeling, analysis, and management framework is proposed. The MIKE21-based numerical approach is first adopted to model the flood routing process in detention basins. With the physical behavior of the flood well understood, physics-informed approaches are proposed to better quantify the dike-break-induced flood risks, e.g., human life, economic and environmental losses, offering valuable information for engineers and policymakers to formulate targeted contingency plans. The Zhuhu detention basin in the Poyang Lake district in China is investigated using the proposed framework. The flood movement in the detention basin is first numerically simulated using the MIKE21-based model. Based on the results, i.e., inundation area, water depth, flow velocity, and arrival time of flood peak, the detention basin is divided into several flood disaster zones. The induced flood risks are then estimated for the different zones. Customized emergency evacuation plans are also formulated for the different flood disaster zones. The study of the Zhuhu detention basin confirms that the proposed framework effectively fuses numerical modeling, physics-informed analysis, and management of flood events, providing an integrated and enhanced decision making process for flood warning and risk mitigation in flood detention basins or at other places.


Language: en

Keywords

Dike breach; Flood detention basin; Flood routing simulation; Inundation pattern; Mitigation measure; Risk assessment

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print