SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Li Y, Fan W. Smart Resil. Transp. 2021; 3(2): 118-130.

Copyright

(Copyright © 2021, Emerald Group Publishing)

DOI

10.1108/SRT-01-2021-0004

PMID

unavailable

Abstract

PURPOSE More and more work zone projects come with the needs of new construction and regular maintenance-related investments in transportation. Work zone projects can have many significant impacts socially, economically and environmentally. Minimizing the total impacts of work zone projects by optimizing relevant schedules is extremely important. This study aims to analyze the impacts of scheduling long-term work zone activities.

DESIGN/METHODOLOGY/APPROACH Optimal scheduling of the starting dates of each work zone project is determined by developing and solving using a bi-level genetic algorithm (GA)-based optimization model. The upper level sub-model is to minimize the total travel delay caused by work zone projects over the entire planning horizon, whereas the lower level sub-model is a traffic assignment problem under user equilibrium condition with elastic demand.

FINDINGS Sioux Falls network is used to develop and test the proposed GA-based model. The average and minimum total travel delays (TTDs) over generations of the proposed GA algorithm decrease very rapidly during the first 20 generations of the GA algorithm; after the 20th generations, the solutions gradually level off with a certain level of variations in the average TTD, showing the capability of the proposed method of solving the multiple work zone starting date optimization problem.

ORIGINALITY/VALUE The proposed model can effectively identify the near-optimal solution to the long-term work zone scheduling problem with elastic demand. Sensitivity analysis of the impact of the elastic demand parameter is also conducted to show the importance of considering the impact of elastic demand parameter.


Language: en

Keywords

Bi-level model; Elastic demand; Genetic algorithm; Optimization; Sensitivity analysis; Total travel delays; User equilibrium; Work zone

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print