SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Song J, Zhu J, Li S. Railw. Sci. 2022; 1(2): 307-323.

Copyright

(Copyright © 2022, Railway Science & Technology Research & Development Center of China Academy of Railway Science Corporation Limited, Publisher Emerald Group Publishing)

DOI

10.1108/RS-04-2022-0002

PMID

unavailable

Abstract

PURPOSE Using the strong motion data of K-net in Japan, the continuous magnitude prediction method based on support vector machine (SVM) was studied.

DESIGN/METHODOLOGY/APPROACH In the range of 0.5-10.0 s after the P-wave arrival, the prediction time window was established at an interval of 0.5 s. 12 P-wave characteristic parameters were selected as the model input parameters to construct the earthquake early warning (EEW) magnitude prediction model (SVM-HRM) for high-speed railway based on SVM.

FINDINGS The magnitude prediction results of the SVM-HRM model were compared with the traditional magnitude prediction model and the high-speed railway EEW current norm.

RESULTS show that at the 3.0 s time window, the magnitude prediction error of the SVM-HRM model is obviously smaller than that of the traditional τc method and Pd method. The overestimation of small earthquakes is obviously improved, and the construction of the model is not affected by epicenter distance, so it has generalization performance. For earthquake events with the magnitude range of 3-5, the single station realization rate of the SVM-HRM model reaches 95% at 0.5 s after the arrival of P-wave, which is better than the first alarm realization rate norm required by "The Test Method of EEW and Monitoring System for High-Speed Railway." For earthquake events with magnitudes ranging from 3 to 5, 5 to 7 and 7 to 8, the single station realization rate of the SVM-HRM model is at 0.5 s, 1.5 s and 0.5 s after the P-wave arrival, respectively, which is better than the realization rate norm of multiple stations.

ORIGINALITY/VALUE At the latest, 1.5 s after the P-wave arrival, the SVM-HRM model can issue the first earthquake alarm that meets the norm of magnitude prediction realization rate, which meets the accuracy and continuity requirements of high-speed railway EEW magnitude prediction.


Language: en

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print