SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Jia J, Wang H, Li X, Hu G, Li H, Li K. Yanshilixue Yu Gongcheng Xuebao 2006; 25(Suppl 2): 3667-3672.

Affiliation

Key Laboratory for the Exploitation of Southwestern Resources and the Environmental Hazard Control E, Chongqing University, Chongqing 400044, China

Copyright

(Copyright © 2006, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences)

DOI

unavailable

PMID

unavailable

Abstract

Monitoring and measurement are necessary procedures in the design and construction of tunnel when using new Austrian tunneling method (NATM). Combined with the pressures on the supporting system and with monitoring of stress and pressure in the large-span underground space of Jiaochangkou-Xinshancun line of Chongqing Light Railway, the experimental results are analyzed and the undetermined laws are disclosed such as pressure of initial supporting I-steel, axial stress of bolt, shotconcrete stress, contacting pressure between shotconcrete and surrounding rocks, supporting pressure of temporary I-steel, contacting pressure of shotconcrete and the secondary lining, and stress of steel of the secondary lining. The methods of choosing the supporting system and structural parameters, the excavation methods of underground space, and the measuring methods and testing methods, are proposed. The stability of supporting system and safety of the structure are determined, and the achieved results can provide references to the information construction in engineering practice.

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print