SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Khajehei H, Ahmadi A, Soleimanmeigouni I, Nissen A. Struct. Infrastruct. Eng. 2019; 15(12): 1597-1612.

Copyright

(Copyright © 2019, Informa - Taylor and Francis Group)

DOI

10.1080/15732479.2019.1629464

PMID

unavailable

Abstract

The objective of this study has been to develop an approach to the allocation of an effective maintenance limit for track geometry maintenance that leads to a minimisation of the total annual maintenance cost. A cost model was developed by considering the cost associated with inspection, preventive maintenance, normal corrective maintenance and emergency corrective maintenance. The standard deviation and extreme values of isolated defects of the longitudinal level were used as quality indicators for preventive and corrective maintenance activities. The Monte Carlo technique was used to simulate the track geometry behaviour under different maintenance limit scenarios and the effective limit was determined which minimises the total maintenance cost. The applicability of the model was tested in a case study on the Main Western Line in Sweden. Finally, a sensitivity analysis was carried out on the inspection intervals, the emergency corrective maintenance cost and the maintenance response time. The results show that there is an optimal region for selecting an effective limit. However, by considering the safety aspects in track geometry maintenance planning, it is suggested that the lower bound of the optimal region should be selected.


Language: en

Keywords

degradation; maintenance; Maintenance limit; Monte Carlo simulation; ordinal logistic regression; track geometry

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print