SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Bababeik M, Zerguini S, Farjad-Amin M, Khademi N, Bagheri M. Transp. Res. Proc. 2019; 37: 27-34.

Copyright

(Copyright © 2019, Elsevier Publications)

DOI

10.1016/j.trpro.2018.12.162

PMID

unavailable

Abstract

The scheduling of maintenance operations in railway is a major concern for both maintenance planners and train dispatchers since it requires the track to be blocked and the rail traffic to be disrupted. This paper provides a mathematical programming model aimed at adjusting the timetable of trains in a single track according to maintenance operations. The uncertainty of the maintenance activities might cause delays in the initial maintenance plan which is further overlapped with pre-determined train scheduling. This study addresses the uncertainty in maintenance activities through including buffer time to the modified scheduling. We also addressed the operational constraints such as speed limit due to maintenance operations in the adjusted scheduling. The result of the model provides railway planners with a modified timetable which includes both maintenance plan and train operations schedules.


Language: en

Keywords

Mathematical programming; Track maintenance; Train scheduling; Uncertainty

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print