SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Eaton D, Dikmen SU, Akbiyikli R. Transport 2018; 33(2): 315–321.

Copyright

(Copyright © 2018, Vilnius Gediminas Technical University and Lithuanian Academy of Sciences, Publisher Vilnius Gediminas Technical University (VGTU) Press)

DOI

10.3846/16484142.2016.1183228

PMID

unavailable

Abstract

The methodology developed in this study presents an approach to the concurrent evaluation of Risk Management (RM) effectiveness during project execution. The method proposed is an adaptation of an approach developed and advocated by Khlebopros et al. (2007) for the mathematical modelling of complex systems, namely the analysis and effects of natural catastrophes. Hence, the method utilizes a phase portrait approach to identify the Prime Cost (PC) of RM of a project. Furthermore, the method provides an approach for comparing the individual identified risks with this PC, and subsequently highlighting a way of classifying and prioritising risks into a rank order for RM attention. The MERA (Multiple Estimating Risk Analysis) approach was utilized for the quantification of risk impact and ultimately the creation of the phase portrait. Besides being accurate and intuitively understandable, the methodology is relatively simple to implement and provides a rapid visualisation of the overall risk extent of a project.

Keywords : risk analysis, risk management, risk monitoring, project management, construction industry, cost control, phase portraits


Language: en

Keywords

construction industry; cost control; phase portraits; project management; risk analysis; risk management; risk monitoring

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print