Journal Article

Citation

Meng Q, Weng J. Transp. Res. C Emerg. Technol. 2013; 29: 72-83.

Copyright

(Copyright © 2013, Elsevier Publishing)

DOI

10.1016/j.trc.2013.01.001

PMID

unavailable

Abstract

To mitigate the negative traffic impact caused by work zones, land transport authorities usually impose constraints on queue length and travel delay. In reality, a single or multiple subwork zone strategy can be adopted to mitigate queue length and travel delay. However, contractors conducting work projects are only concerned with the minimization of the total maintenance cost. From the contractor's standpoint, this study proposes a total maintenance cost minimization model to determine the optimal subwork zone length and project start time, subject to queue length and travel delay constraints. Using average hourly traffic (AHT) data, this study shows that total user delay is non-differentiable with respect to the subwork zone length and project start time. This interesting finding demonstrates that previous analytic expressions of the optimal subwork zone length cannot hold for AHT data. To solve the proposed model, an enumeration method is designed. Finally, a numerical example created from the roadside tree trimming in Singapore is used to assess the model and solution method proposed in this study.

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print