SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Xin-yu W, Ping-an Z, Xuan C, Li D, Ben-you J. Procedia Eng. 2012; 29: 3267-3275.

Copyright

(Copyright © 2012, Elsevier Publishing)

DOI

10.1016/j.proeng.2012.01.478

PMID

unavailable

Abstract

It is difficult to simulate the large scale flood control systems because they consist of several different kinds of flood control projects, such as levee, reservoirs and detention basins. By applying the approach of system decomposition and coupling, this paper decomposes the complicated flood control system into single constructional element for water conservancy project, conducts simulation respectively, and then couplings single constructional elements by taking advantages of key technologies such as node encoding, topology matrix and order code of calculation etc., and finally conducts simulation scheduling on upstream flood control system of Zhengyanghuan, Huaihe through employing compensation scheduling model. According to simulation results, the complicated simulation scheduling of flood control system can provide decision supports as well as effects to flood control decision makers in a rapid manner.

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print