SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Ravidas A, Rathinam S, Wood Z. Proc. Inst. Mech. Eng. Pt. G J. Aerosp. Eng. 2013; 227(7): 1122-1129.

Copyright

(Copyright © 2013, SAGE Publishing)

DOI

10.1177/0954410012450546

PMID

unavailable

Abstract

This article addresses a two runway, scheduling problem that aims to assign the aircraft to the runways and find an arrival time for each aircraft such that the sum of the delays of all the aircraft is minimized subject to the timing, safety, and chain-type precedence constraints for the aircraft. An optimal algorithm is developed for the two runway, scheduling problem based on generalized dynamic programming. Computational results are presented to show that this algorithm is computationally faster than the existing dynamic programming algorithm for the two runway, scheduling problem.


Language: en

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print