SAFETYLIT WEEKLY UPDATE

We compile citations and summaries of about 400 new articles every week.
RSS Feed

HELP: Tutorials | FAQ
CONTACT US: Contact info

Search Results

Journal Article

Citation

Norcross ED, Elliott BM, Adams DB, Crawford FA. Am. Surg. 1993; 59(1): 28-33.

Affiliation

Department of Surgery, Medical University of South Carolina, Charleston 29425.

Copyright

(Copyright © 1993, Southeastern Surgical Congress)

DOI

unavailable

PMID

8480928

Abstract

Hurricane Hugo struck Charleston, South Carolina, on September 21, 1989. This report analyzes the impact this storm had upon surgical care at a university medical center. Although disaster planning began on September 17, hurricane damage by high winds and an 8.7-foot tidal surge led to loss of emergency power and water. Consequently, system failures occurred in air conditioning, vacuum suction, steam and ethylene oxide sterilization, plumbing, central paging, lighting, and refrigeration. The following surgical support services were affected. In the blood bank, lack of refrigeration meant no platelet packs for 2 days. In radiology, loss of electrical power damaged CT/MRI scanners and flooding ruined patient files, resulting in lost information. In the intensive care unit, loss of electricity meant no monitors and hand ventilation was used for 4 hours. In the operating room, lack of temperature and humidity control (steam, water, and suction supply) halted elective surgery until October 2. Ground and air transportation were limited by unsafe landing sites, impassable roads, and personnel exhaustion. Surgical planning for a major hurricane should include: 1) a fail-safe source of electrical power, 2) evacuation of as many critically ill patients as possible before the storm, 3) cancellation of all elective surgery, and 4) augmented ancillary service staffing with some, although limited, physician support.


Language: en

NEW SEARCH


All SafetyLit records are available for automatic download to Zotero & Mendeley
Print