TY - JOUR PY - 1985// TI - Delays at pedestrian crossings - 4. Mathematical models JO - Traffic engineering and control A1 - Griffiths, JD A1 - Hunt, JG A1 - Marlow, M SP - 277 EP - 282 VL - 26 IS - 5 N2 - This paper is the fourth and last in a series of articles about a major study of delays at pedestrian crossing facilities - Zebra crossings and Fixed-Time and Vehicle Actuated Pelicans. This article provides mathematical relationships which link pedestrian and vehicle delays to flow levels and other crossing parameters and indicates some general applications of the study.

LA - SN - 0041-0683 UR - http://dx.doi.org/ ID - ref1 ER -