TY - JOUR PY - 2017// TI - Inventory-transportation integrated optimization for maintenance spare parts of high-speed trains JO - PLoS one A1 - Lin, Boliang A1 - Wang, Jiaxi A1 - Wang, Huasheng A1 - Wang, Zhongkai A1 - Li, Jian A1 - Lin, Ruixi A1 - Xiao, Jie A1 - Wu, Jianping SP - e0176961 EP - e0176961 VL - 12 IS - 5 N2 - This paper presents a 0-1 programming model aimed at obtaining the optimal inventory policy and transportation mode for maintenance spare parts of high-speed trains. To obtain the model parameters for occasionally-replaced spare parts, a demand estimation method based on the maintenance strategies of China's high-speed railway system is proposed. In addition, we analyse the shortage time using PERT, and then calculate the unit time shortage cost from the viewpoint of train operation revenue. Finally, a real-world case study from Shanghai Depot is conducted to demonstrate our method. Computational results offer an effective and efficient decision support for inventory managers.

Language: en

LA - en SN - 1932-6203 UR - http://dx.doi.org/10.1371/journal.pone.0176961 ID - ref1 ER -