TY - JOUR PY - 2014// TI - Research on fairway layout in bridge waters JO - Jiaotong Yunshu Xitong Gongcheng Yu Xinxi A1 - Ai, Wan-Zheng A1 - Ding, Tian-Ming SP - 131 EP - 137 VL - 14 IS - 1 N2 - Bridge area traffic accident is closely related with fairway layout. The important considered factors in bridge waters fairway layout are mainly ship's dimensions, ship's maneuvering characteristics and water's condition are neglected in Chinese fairway layout regulation. It is adverse to ship's safety navigation if only ship's dimensions are considered in fairway layout engineering. So it is necessary to study fairway layout in bridge waters based on considering all related factors. Ship's maneuvering characteristics, water's condition and the fairway layout method in bridge waters are studied. The results show that fairway's width in bridge waters include ship's track width, distance between ships, additional width caused by ship's maneuvering characteristics. Meanwhile, the fairway in bridge waters should be outside of pier's turbulent scope. Fairway layout methods are put forward by using ship maneuvering theory and statistical theory respectively.

Language: zh

LA - zh SN - 1009-6744 UR - http://dx.doi.org/ ID - ref1 ER -