
@article{ref1,
title="Inventory-transportation integrated optimization for maintenance spare parts of high-speed trains",
journal="PLoS one",
year="2017",
author="Lin, Boliang and Wang, Jiaxi and Wang, Huasheng and Wang, Zhongkai and Li, Jian and Lin, Ruixi and Xiao, Jie and Wu, Jianping",
volume="12",
number="5",
pages="e0176961-e0176961",
abstract="This paper presents a 0-1 programming model aimed at obtaining the optimal inventory policy and transportation mode for maintenance spare parts of high-speed trains. To obtain the model parameters for occasionally-replaced spare parts, a demand estimation method based on the maintenance strategies of China's high-speed railway system is proposed. In addition, we analyse the shortage time using PERT, and then calculate the unit time shortage cost from the viewpoint of train operation revenue. Finally, a real-world case study from Shanghai Depot is conducted to demonstrate our method. Computational results offer an effective and efficient decision support for inventory managers.<p /> <p>Language: en</p>",
language="en",
issn="1932-6203",
doi="10.1371/journal.pone.0176961",
url="http://dx.doi.org/10.1371/journal.pone.0176961"
}