
@article{ref1,
title="Short-term work team scheduling models for effective road repair and management",
journal="Transportation planning and technology",
year="2009",
author="Tang, Ching-Hui and Yan, Shangyao and Chang, Chia-Wei",
volume="32",
number="3",
pages="289-311",
abstract="Abstract In this study, we focus on the development of work team routing/scheduling models incorporating stochastic travel and repair times. Robust and expected optimization concepts, combined with a time?space network technique, are used to develop the models. We perform numerical tests based on operational data for Taoyuan County in Taiwan. The test results show the good performance of the models.<p />",
language="en",
issn="0308-1060",
doi="10.1080/03081060903017150",
url="http://dx.doi.org/10.1080/03081060903017150"
}